Took 3 days to get our drone maps to line up with the site survey

The Trimble data was off by 4 feet against what the drone software showed for a slab pour in Reno, and I wasted a full week fighting the coordinate system before realizing the surveyor used a different datum. Has anyone else had this mismatch with drone imports and field survey points, or is it just us?